STLCC Florissant Valley Under Construction

Construction is in full swing at STLCC Florissant Valley as the campus gears up to welcome its latest addition: the Advanced Manufacturing Center. This state-of-the-art facility promises to be a game-changer for the region’s educational landscape. At nearly 100,000 square feet, the Advanced Manufacturing Center is a 3 story structure that integrates the ideas of a “main street” and a “town square.” The “main street” is a gallery-like hallway that provides space for exhibition of student projects, connects the building from West to East, and terminates into a tiered student-scape. The idea of a traditional town square is deconstructed and stacked vertically as a series of linear pathways that overlook a central 3-story open atrium. Floating in the center of the vertical town square and above the main street are the building’s makerspace and 3D printer lab. The “main street” and “town square” are woven together – creating a bustling and dynamic educational space for students and faculty alike.

 

 

JEMA Logo