![](https://jemastl.com/wp-content/uploads/2018/10/IMG_2373.jpg)
LAKE SAINT LOUIS FIRE MOVES FORWARD
Lake Saint Louis’ new Fire Station is progressing. The 13,000-square-foot, Essential/Mission Critical Facility is slated to be complete by the beginning of 2019.
![](https://jemastl.com/wp-content/uploads/2018/10/IMG_1815.jpeg)
![](https://jemastl.com/wp-content/uploads/2018/10/IMG_2373.jpeg)
![](https://jemastl.com/wp-content/uploads/2018/10/IMG_1805.jpeg)
![](https://jemastl.com/wp-content/uploads/2018/10/IMG_1813.jpeg)
A planning, architecture, and interior design firm located in St. Louis.
Lake Saint Louis’ new Fire Station is progressing. The 13,000-square-foot, Essential/Mission Critical Facility is slated to be complete by the beginning of 2019.